Manchester Renewables installed a commercial solar PV system on a primary school during its new-build construction phase. Panels were fitted across both flat and pitched roof sections of the school building, with the system integrated into the build programme for a clean, seamless finish.
Installing solar during construction is the most cost-effective approach — scaffolding is already in place, roof access is straightforward, and the system can be wired in before the building is handed over. The school benefits from lower energy bills from day one.
The system was sized to cover a large proportion of the school's daytime electricity demand — lighting, IT equipment, kitchen, and heating controls. With pupils on-site during peak solar generation hours, self-consumption rates are high, meaning more of the energy generated is used rather than exported.
Primary School
Property Type
New Build
Install Phase
Flat & Pitched
Roof Type
4-5 Years
Est. Payback
Greater Manchester
Location
MCS Certified
Certification
Project Gallery
Project Highlights
- Solar system integrated during the new-build construction phase for a clean finish
- Panels installed across flat and pitched roof sections to maximise generation
- High self-consumption rate — school hours align with peak solar generation
- Lower energy bills from the first day the school opens
- No additional scaffolding costs — installed during the build programme
- MCS certified installation with full 25-year panel performance warranty