Primary School Solar Installation, Greater Manchester

Greater Manchester

Manchester Renewables installed a commercial solar PV system on a primary school during its new-build construction phase. Panels were fitted across both flat and pitched roof sections of the school building, with the system integrated into the build programme for a clean, seamless finish.

Installing solar during construction is the most cost-effective approach — scaffolding is already in place, roof access is straightforward, and the system can be wired in before the building is handed over. The school benefits from lower energy bills from day one.

The system was sized to cover a large proportion of the school's daytime electricity demand — lighting, IT equipment, kitchen, and heating controls. With pupils on-site during peak solar generation hours, self-consumption rates are high, meaning more of the energy generated is used rather than exported.

Primary School

Property Type

New Build

Install Phase

Flat & Pitched

Roof Type

4-5 Years

Est. Payback

Greater Manchester

Location

MCS Certified

Certification

Project Gallery

Project Highlights

  • Solar system integrated during the new-build construction phase for a clean finish
  • Panels installed across flat and pitched roof sections to maximise generation
  • High self-consumption rate — school hours align with peak solar generation
  • Lower energy bills from the first day the school opens
  • No additional scaffolding costs — installed during the build programme
  • MCS certified installation with full 25-year panel performance warranty

Common Questions

Why install solar on a school during construction?
Installing during the build phase is cheaper and less disruptive. Scaffolding is already up, the roof is accessible, and wiring can be integrated before handover. The school gets lower energy bills from day one with no retrofit costs.
How much can a primary school save with solar?
Schools with good daytime usage typically save 40-60% on electricity bills. With pupils on-site during peak generation hours, self-consumption is high, meaning more savings and less wasted export.
Do schools need planning permission for solar panels?
Most school rooftop installations fall under permitted development. New builds typically include solar as part of the planning application. We handle all planning checks as part of our survey process.
Can schools get funding for solar panels?
Schools can access funding through the Public Sector Decarbonisation Scheme and Salix Finance interest-free loans. Local authority maintained schools and academy trusts are both eligible. We can advise on available options.