Solar Panel Survey

A thorough solar panel survey is the essential first step to a successful installation. At Manchester Renewables, our MCS-certified surveyors visit your property to assess every factor that affects system performance — from roof structure and orientation to shading patterns and electrical capacity. This means the system we design is perfectly matched to your home and delivers the energy yield we promise.

Our surveys are completely free with no obligation. We typically visit within 5-7 working days of your enquiry and provide a detailed written quotation within 48 hours of the survey. Unlike some companies that rely solely on satellite imagery, we believe an in-person visit is essential to identify issues that cannot be seen from above — such as rafter spacing, consumer unit condition, and cable routing.

Solar panel installation in progress on Manchester home

Solar Panel Survey — What's Included

Roof Assessment

We measure your roof dimensions, check the pitch angle (ideal is 30-35 degrees), assess tile condition, and verify structural integrity for panel mounting.

Shading Analysis

Using a Solar Pathfinder or equivalent tool, we map shading from trees, chimneys, neighbouring buildings, and other obstructions throughout the year.

Electrical Inspection

We inspect your consumer unit (fuse board) to check capacity, earthing arrangement, and whether an upgrade is needed to accommodate the solar inverter.

Energy Usage Review

We review your recent electricity bills or smart meter data to understand your consumption patterns and recommend the right system size.

Written Report & Quote

You receive a detailed survey report with system design, predicted annual yield, estimated savings, and a fixed-price installation quotation.

UK Government Scheme

MCS Installation Standard (MIS 3002): Mandatory Requirement

The Microgeneration Certification Scheme (MCS) requires all certified installers to complete a thorough site survey before installation. This standard (MIS 3002) makes sure systems are designed safely and perform as predicted. Only MCS-certified installations qualify for the Smart Export Guarantee.

Check Eligibility

Why Solar Panel Survey Matters

  • An accurate survey prevents costly problems during installation such as roof reinforcement or consumer unit upgrades
  • Proper shading analysis means your panels are positioned for maximum annual energy generation
  • Understanding your energy usage means the system is sized correctly — avoiding overspending on unnecessary capacity
  • MCS standards require a pre-installation survey — it is not optional for accredited installers

Cost Guidance

Our solar panel surveys are completely free for homeowners across Greater Manchester. There is no obligation to proceed with an installation. If you do go ahead, the survey cost is included in your installation price. For commercial properties or sites outside our standard coverage area, a refundable survey deposit of £99 may apply.

More Solar Panel Installer Services

Solar Panel Survey — Common Questions

What happens during a solar panel survey?
Our surveyor spends 45-60 minutes at your property. They inspect the roof from inside the loft and outside, check your electrical system, review your energy bills, take measurements and photos, and discuss your preferences. The visit is completely non-invasive.
Do I need to be home for the survey?
Yes, ideally. We need access to your loft space and consumer unit (fuse board), which are inside your home. We also like to discuss your energy usage and any plans (such as adding battery storage later) that might affect system sizing.
How long after the survey do I get a quote?
We aim to send your detailed quotation within 48 hours of the survey. This includes the system design, predicted annual yield, estimated savings, and a breakdown of all costs. The quote is valid for 30 days.
What if my roof is not suitable for solar panels?
If our survey reveals your roof is unsuitable — due to structural issues, heavy shading, or poor orientation — we will tell you honestly rather than proceeding with a suboptimal installation. We may suggest alternatives such as ground-mounted panels or a battery-only system.